Roofing Contract Checklist: What to Check Before Signing

Roofing Contract Checklist: What to Check Before Signing
In briefA roofing contract should name the contractor and its license number, describe the work on your specific roof, list materials by brand and color, say who pulls the permit and whether the fee is included, set start and finish dates, tie each payment to finished work, require written change orders, cover cleanup, and include cancellation and mechanics lien notices. In California, CSLB says the down payment cannot exceed $1,000 or 10 percent of the price, whichever is less. Check permit rules with your local building department.

What should a roofing contract include?

A roofing contract should name the licensed contractor and its license number, describe the work on your specific roof, list materials by brand, product line and color, say who pulls the building permit, set start and completion dates, break the price into payment stages tied to finished work, explain how changes and hidden damage are priced, cover cleanup, and carry the cancellation and mechanics lien notices. Read every line before you sign, and never sign a page with blanks.

Why does the contract matter more than the estimate?

An estimate is a sales document; a contract is the thing you can hold someone to. If you are still deciding between bids, start with our bid comparison checklist. This page picks up when one proposal has become a contract waiting for your signature.

In California, the Contractors State License Board (CSLB, the state agency that licenses contractors) says in its consumer guide to home improvement contracts that "the terms of all home improvement projects over $500 (combined material and labor costs) must be in a contract." A reroof clears that bar easily. Anything promised at your kitchen table that is missing from the paper is, for practical purposes, a pleasant conversation you once had.

Who is the contract with, and who is signing it?

Verify license status with CSLB directly rather than relying on a photocopy of a card.

Does the scope describe your roof or a generic one?

The CSLB guide puts it plainly: a thorough contract "details who will do the work, what materials will be used, where the work will be done, when it will be done, and how much it will cost."

For a roof, a specific scope usually answers these questions in writing:

If an answer lives only in your memory of a phone call, ask for it on the page. Our guide to roof replacement cost factors explains why each of these items moves the price.

Are the materials named precisely enough to check?

CSLB advises that a contract "should be as specific as possible regarding all materials to be used, such as the style, brand, model, quality, quantity, weight, color, size, or any other description that may apply." On a roof, that means the covering (manufacturer, product line, color), the underlayment, and any named accessory products such as ridge vents or drip edge.

Precision lets you confirm on delivery day that the pallets in your driveway match what you paid for, and it ties the job to the right manufacturer warranty.

Who pulls the permit, and is the fee included?

The CSLB guide's checklist asks two direct questions: does the contract "state whether you or your contractor will pull necessary building permits before the work starts," and "are the permit fees included in the contract price?" Get both answers in the document.

Permit and inspection rules depend on the jurisdiction. Around San Diego, the City, Chula Vista and the County each run their own building departments; our roofing permit guide for San Diego shows where to verify. For your address, check with your local building department.

How should payments be staged?

Three California rules, each from the CSLB guide, shape what a fair payment section looks like:

If financing is involved, the guide says finance charges "must be calculated and laid out in detail, separate from the contract amount." The Federal Trade Commission's advice on home improvement scams is blunt on timing: "never make the final payment until the work is done and you're satisfied with it."

Roof prices vary widely by region and roof; the figures above only illustrate the cap and are not estimates of what a roof costs.

How are changes and hidden damage handled?

Roofs keep secrets until the old layers come off. Rotted sheathing (the wood deck under the roofing) is the classic surprise, and its price is easier to agree before the tear-off than during it.

CSLB says that if the price changes, "it MUST be done with a written change order that becomes a part of the contract," and the agency's contracts page notes that "after a change order is signed, it becomes part of the written contract." In our view, a good roofing contract also states a unit price for deck replacement (per sheet or per square foot), says the contractor will show you the damage, ideally with photos, before replacing it, and caps how much can be added without your signature. A verbal "we'll take care of it" is not a change order.

What protects you from mechanics liens?

A mechanics lien is a claim recorded against your property by someone who helped improve it and was not paid. The CSLB guide warns that "even if the contractor is paid in full, unpaid subcontractors, suppliers, and laborers involved in the project may record a mechanics lien," and that an owner "could be forced to pay twice." The same guide says contractors are required to give consumers a "Mechanics Lien Warning," so look for it in your paperwork.

CSLB's page on how to prevent a mechanics lien lays out the routine:

The CSLB guide also suggests asking the contractor for a list of the subcontractors and material suppliers on the job, and mentions paying with a joint check made out to both the contractor and the subcontractor or supplier. For anything about a lien already recorded, talk to a California construction attorney.

What are your cancellation rights?

The CSLB guide says state law gives the buyer "three (3) business days (or five business days if the buyer is 65 or older)" to cancel, by written notice, and that the contractor must return any money paid "within 10 days of receiving the cancellation request." The guide also notes this right "does not apply" if the contract is negotiated at the contractor's place of business, and that emergency "service and repair" contracts are an exception. The FTC lists "a written statement of your right to cancel" among the things a contract should include. If the notice is missing, ask why before you sign.

Does the contract cover cleanup and protecting the property?

CSLB recommends the contract include everything agreed, "up to and including complete cleanup and removal of debris and materials." For a tear-off, spell out who pays for the dumpster or haul-away, how landscaping, solar panels and side yards will be protected, and whether the crew will do a magnetic sweep for nails in the driveway and lawn.

What documents should you have when the job is done?

Write the handoff list into the contract so it is not a favor you have to request later:

Keep these with your house records. The CSLB guide notes that consumers have "four (4) years to file a complaint" with CSLB about a faulty project.

Roof work is dangerous. Do your final check from the ground, a window or with binoculars, and ask the contractor for photos of anything you cannot see; do not climb onto the roof to inspect the work yourself.

Sources

FAQ

How much can a roofer ask for up front in California?

The Contractors State License Board says a home improvement down payment cannot be more than $1,000 or 10 percent of the contract price, whichever is less, with no exception for special order materials. The exception is a contractor with a blanket performance and payment bond on file with CSLB. After the deposit, payments should follow a written schedule and should not exceed the value of work already performed.

What is a change order on a roofing job?

A change order is a written, signed amendment to the contract that changes the work or the price, such as replacing rotted roof decking found during tear-off. CSLB says a price change must be made with a written change order that becomes part of the contract. Ask for the unit price of deck replacement in the original contract so any surprise is priced before work starts.

How do lien releases protect a homeowner?

Unpaid subcontractors and suppliers can record a mechanics lien against your property even if you paid the contractor. CSLB advises getting a signed conditional release from possible lien claimants before each payment and an unconditional release after you pay, and says you may withhold the next payment until you receive the unconditional releases for the previous one. For a lien already recorded, consult a California construction attorney.

Can I cancel a roofing contract after signing it?

Often, yes. CSLB says California law gives buyers three business days, or five business days for buyers 65 or older, to cancel a home improvement contract by written notice, and the contractor must return money paid within 10 days. The right does not apply when the contract is negotiated at the contractor's place of business, and emergency service and repair contracts are an exception.

Should I climb on the roof to check the finished work?

No. Roof work is dangerous, and a final check is best done from the ground, from a window, or with binoculars. Ask the contractor for photos of areas you cannot see, and confirm the paperwork instead: the final inspection sign-off where a permit was required, written workmanship and manufacturer warranties, signed change orders, and unconditional lien releases for the final payment.